Annex FourDamp & disrepair · England
Section 21 abolished 1 May 2026

The disrepair paperwork
section 9A actually asks for.

Section 11 needs something broken. Section 9A doesn't — and with no-fault eviction gone, tenants can raise conditions with nowhere else for the argument to go. The Landlord Damp, Mould & Disrepair Pack gives you the dated report, the access log and the document schedule a claim actually turns on, so it's evidence you already hold rather than something you're assembling after a letter of claim lands.

s.11Repair — something broken
s.9AFitness — nothing need be
s.21Abolished 1 May 2026

Pick a tier

One property, a portfolio, or a whole agency.

Single landlord
£39
One property
  • Sections 11 and 9A explained plainly, with the 29 HHSRS hazards that decide fitness sitting alongside them
  • A damp & mould report form, dated at the point a case is first reported — the date a defence file starts from
  • An access log and document schedule, built for the disrepair-claim world section 21's abolition created
  • PDF for printing, plus an editable Word version
Buy now →
Portfolio landlord
£69
Multiple properties, one landlord
  • Everything in Single
  • A per-property tracking sheet, cross-referenced against EPC and electrical safety certificate renewal dates
  • Built for a landlord managing more than a handful of tenancies without dedicated admin support
Buy now →
Agency licence
£199
Letting & managing agents
  • Everything in Portfolio
  • Licensed for use across your whole team, not one named individual
  • An instruction letter template for handling repairs and disrepair correspondence on a landlord client's behalf
Buy now →

Delivered as an instant download after checkout. Built around a 13-page guide and eight forms, including the full disrepair-claim defence file — 698 fillable fields in total.

Not sure which tier

Talk to us before you buy.

Tell us how many properties you manage and we'll say which tier actually fits.