Section 21 abolished 1 May 2026
The disrepair paperwork
The disrepair paperwork
section 9A actually asks for.
Section 11 needs something broken. Section 9A doesn't — and with no-fault eviction gone, tenants can raise conditions with nowhere else for the argument to go. The Landlord Damp, Mould & Disrepair Pack gives you the dated report, the access log and the document schedule a claim actually turns on, so it's evidence you already hold rather than something you're assembling after a letter of claim lands.
s.11Repair — something broken
s.9AFitness — nothing need be
s.21Abolished 1 May 2026
Pick a tier
One property, a portfolio, or a whole agency.
Single landlord
£39
One property
- Sections 11 and 9A explained plainly, with the 29 HHSRS hazards that decide fitness sitting alongside them
- A damp & mould report form, dated at the point a case is first reported — the date a defence file starts from
- An access log and document schedule, built for the disrepair-claim world section 21's abolition created
- PDF for printing, plus an editable Word version
Portfolio landlord
£69
Multiple properties, one landlord
- Everything in Single
- A per-property tracking sheet, cross-referenced against EPC and electrical safety certificate renewal dates
- Built for a landlord managing more than a handful of tenancies without dedicated admin support
Agency licence
£199
Letting & managing agents
- Everything in Portfolio
- Licensed for use across your whole team, not one named individual
- An instruction letter template for handling repairs and disrepair correspondence on a landlord client's behalf
Delivered as an instant download after checkout. Built around a 13-page guide and eight forms, including the full disrepair-claim defence file — 698 fillable fields in total.
Not sure which tier
Talk to us before you buy.
Tell us how many properties you manage and we'll say which tier actually fits.